<img height="1" width="1" style="display:none;" alt="" src="https://dc.ads.linkedin.com/collect/?pid=462532&amp;fmt=gif https://dc.ads.linkedin.com/collect/?pid=462532&amp;fmt=gif">

Technical Manual S20: Ground Conditions

20. Ground Conditions v9

Download Section 20 (Ground Conditions)

Version 9 of the LABC Warranty Technical Manual has been written by our technical experts to provide guidance on meeting the technical standards required at different stages of construction.

Section 20 of the manual covers Ground Conditions.

Contents include:

  • Additional functional requirements for warranty approval (in addition to our general functional requirements)
  • Site investigation requirements, broken down into:
    • Responsibilities and requirements
    • Site history, geology, mining and solution features
    • Pollution and contamination of pathways
    • Geoenvironmental assessment
    • In-situ and laboratory testing
    • Report requirements and Phase 1 and 2 checklists
    • Soil and rock descriptions